From: route@monster.com
Sent: Friday, April 08, 2016 12:09 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 PMP
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Emad Mofarej Kouchaki, PMP Permanent resident (Green card holder) of the U.S. 1415 Eldridge PKWY Apt2637 Houston TX 77077, (832)279-9502 , EmadPMP@gmail.com Synopsis EPC (Engineering, Procurement & Construction)
Project Planner/Scheduler with 9 years of experience and proven ability of
teaming with internal and external stakeholders to execute projects on time
and within budget. Experience with project scheduling, controls and planning,
Early Conceptual Schedule/FEL/FEED, engineering, procurement, construction,
installation and pre-commissioning on on-shore and offshore Oil and gas and
other industries mega-projects with a combined value of $5B. Well-versed
in WBS, CPM, PERT, Resource estimation and Resource loading,
Performance Curves, cash flows and EVM project management techniques, PMI PMP
holder, and a seasoned Microsoft Project and Primavera P6 user and
administrator (9 years). Experience Project Planner/ Scheduler, Faradast Energy Falat Co.
Sep. 2011 – Sep. 2015 Deputy of Project planning and scheduling
management for the Star-Oil Bandar Abbas gas condensate refinery. The
project includes Refinery a 300km feed pipeline and seawater intake and
had a total estimated cost of $4.5B. Duties included: ·
Participate
In schedule workshops, defining Scope of work (SOP), Establishing project
Work Breakdown Structure(WBS) and collecting WBS dictionary and work package
definitions, Master schedule, Detailed Scheduled, Estimating resource needs
and creating cost and resource loaded schedules, Schedule baselines, s-curves
and cash flows and look ahead plans ·
monitor
performance on sub-projects, facilitating sub-contractors schedules reviews,
integrate the contractors' schedules into a high-level master schedule and
evaluation and provide resolution to management team with help of Primavera
P6. ·
Assisting Project
Manager by tracking critical activities and responsible for smooth interface
with contractor's project controls team on carrying out required updates
& revision (300 vendors, 8 EPC contractors and 5 consultants) and
maintenance of detailed construction schedule. ·
Creation
of multi-level interactive periodic and ad-hoc work performance reports using
Primavera EPPM, and in-house PMIS (S-curves, Cost & Schedule variance and
EVA forecasts, Look ahead plans, Trend analysis). Reports included Cost &
Schedule variance and EVA reports, forecasts. ·
Evaluate
and monitor deliverable schedules, and analyze milestones and
interdependencies for conformance with contractual obligations and performing
schedule analysis to come up with alternatives to minimize exposure to claims
and avoid time extensions and provide alerts if necessary. ·
Conduct
weekly meetings with project teams to validate progress of completed work and
future activities in order to update project schedules ·
Work
closely with Project Risk Specialist to provide analyses and evaluation
on schedule impacts of risks ·
Setup,
and administration of Oracle’s Primavera P6 EPPM hosting sites, and train
planning team, project and senior management and client how to use it
effectively Key achievement: Received employee of the year award. Project
Planner/ Scheduler , Cost Engineer, Takhsis Pars
Engg. & Mgmt. Co
Feb. 2009 - Sep. 2011 Project planner and scheduler and cost engineer
for two EPC projects (CERRO AZUL cement project, Hamedan waste
water treatment plant and Chabahar water treatment plant) with a
total estimated cost of $300M. Duties included: ·
Gathering
information from the project team to develop Master schedule, Work Breakdown
Structure (WBS), Level 5 Project Plan (Primavera P6), administer rolling wave
planning, recovery schedules, project resource allocation and manpower
loading. ·
Forensic
evaluation of contractor schedules, impact/delay analysis, estimating costs
of delays for approval and assist in claims resolution. ·
Estimating
activity resource and cost and project cost and schedule baseline for cost
monitoring and schedule performance benchmarking. ·
Developing
weekly, monthly and custom progress and status reports to track and
communicate project progress based on critical path and earned value. ·
Conducting
Risk analysis and what if analysis and highlight risk impacts to project
schedule and cost and calculate. ·
Reviews
and analysis project invoices to ensure accuracy and timely submission. ·
Providing
look a-head schedule to ensure readiness to progress with future works. Key achievement: Assisted in development of in-house tool used to
analyze project key performance indicators of project progress. Project Scheduler, Rahbaran
Co.
May 2008 - Feb. 2009 Project Planner/Scheduler for two projects (Gachsaran
Hospital EPC project and Sanandaj Hoojestan Complex construction
Project) with a total estimated cost of $100M. Duties included: ·
Working
with project manager to review schedule and focus/prioritize resources to
reach the targeted time lines (Using Primavera P6). ·
Identify
Critical Path Activities (CPA) and near critical activities and advise
project team accordingly, integrating subcontract schedules with master
schedule. ·
Establishing
project scope, Work breakdown structure(WBS), master and detailed schedule
and project cost and schedule baseline to create control account to monitor
cost and schedule. ·
Prepare
and distributing weekly, biweekly and monthly status reports to Project
Manager and stakeholders. ·
Report
on project milestones to project manager to ensure timely completion of
project requirements. ·
Project scheduler, rasin Construction
Co.
Jun. 2006 - May 2008 Project scheduler for Iran Railways construction
program comprising of over railroad & construction project. Duties
included: ·
Tracking
sub-projects compliance with master plans, defining project milestones,
monitoring achievements, and delivering recommendations on project schedules
utilizing Primavera P3 and P6 and MS Project server. ·
Identifying
projects risks and potential issues and propose/analyzed corrective and
preventive actions and contingency plans. ·
Structuring
comprehensive project schedules incorporating variance reports, resource
leveling, and project updates. ·
Establishing
and managing stakeholder engagement and communication. ·
Preparing
various project reports and presentations on a monthly and ad-hoc basis,
(profiling baseline & working schedules, critical path items, project
& program schedule variances, expenses variances and project earned
value, etc.). Education ·
MS
Financial Engineering, Raja University,
Qazvin, Iran (Feb 2010) Received highest (3.7/4) GPA among 2010 graduates. ·
BS
Industrial Engineering, Azad University,
Tehran, Iran (Aug 2006) Certificates ·
PMP
(Project Management Professional) 29 Sep 2015 ·
Integrated
Management system internal audit, NIS Academy, 2015 ·
Primavera
P6 Professional, Aryana, 2013 ·
Tendering(Procurement
documents and proposals preparation -ITB,RFQ and Bid), Aryana, 2013 ·
Knowledge
Management, Aryana, 2013 Computer Skills ·
Oracle
Primavera P6 EPPM, Professional, and Client (9 Years) ·
Oracle
Primavera Risk Management , PERT and Monte Carlo Simulation, What-If analysis
(7 years) ·
Microsoft
Project, Microsoft office suite(Word, Excel, PowerPoint, Visio) (9 years) Work Eligibility Permanent resident (Green card holder) of the
U.S. |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Advanced |
|
|
Farsi |
Fluent |
|
|
|